A moss-covered wooden fence runs along the left side of a grass lawn beside dark-sided houses with porches, backed by tall conifer trees under an overcast sky.

Heat Pump Installation in Redding, CA

Tell us about the job

Takes about a minute. No obligation.

New system or replacementHeat PumpShasta County, CA
Step 1 of 2

What ZIP code is the job in?

Electricity in California ran 31.97 cents per kilowatthour in 2024, among the highest rates in the country. A heat pump moves heat instead of burning gas or generating it with resistance coils, so it gets more warmth or cooling out of every kilowatt it draws. In a state paying this much per kilowatthour, that difference in efficiency is what shows up on the bill. Two systems with the same price tag can cost very different amounts to run here. Worth asking any contractor you talk to for the efficiency rating of the unit they're quoting, and comparing it against others before you decide.

8 months
October through May, your system heats
4 months
June through September, it cools
32°F
the average winter night it heats against
88°F
the average summer afternoon it cools against
Isometric line illustration of a cutaway house showing interior rooms with furniture, ceiling ductwork connected to an indoor air handler, and a line running outside to an outdoor condenser unit.
Your system heats October through May and cools June through September.

NOAA nClimDiv, 1991–2020 normals

Shasta County logged 147 winter storms and 51 damaging wind events over the past decade.

Where the outdoor unit sits and how it's protected matters here, since that unit is what keeps the heat running.

Winters stay mild here, so this heat pump won't work hard to keep up

51 damaging wind events from 2015 to 2024
9 hail events from 2015 to 2024
147 winter storms from 2015 to 2024

Gas heats 42.1% of homes in Shasta County, more than any other fuel. Electricity comes next at 33.6%. That means most of the furnaces a heat pump would replace or pair with here are gas furnaces. A heat pump can still work alongside one of those in a dual fuel setup, switching over to gas only when it gets cold enough that the heat pump loses its edge. If your home runs on propane instead, ask a contractor whether straight electric or dual fuel makes more sense given what you pay per gallon against what you pay per kilowatt hour.

Get it in before September, ahead of eight months of heat

Heat runs October through May here, cooling June through September. Installing before September means the heat pump is in place and set up before it has to carry the house through its longest season. It also gives a dual fuel setup, if that's the route you take, a full stretch of mild weather to get the handoff between heat pump and furnace tuned before it matters.

Find a contractor
A gray air-source heat pump mounted on a concrete pad next to a house with gray vinyl siding, surrounded by gravel and flanked by green shrubs and white hydrangea flowers.

Mild nights, so the install matters more than the tier

A 32°F average overnight low across December through February is not extreme cold. A heat pump here is not fighting single-digit nights the way one might in a colder state, so it does not need to be the highest-efficiency model on the lot to hold up. What matters more is how it is installed, given the storms and wind already covered above. Put the dollars into a good pad, solid mounting and a tech who sets the refrigerant charge right, before you pay up for a top efficiency tier you may not need here.

The old equipment has to come out first

A furnace or air conditioner being replaced gets disconnected, drained of refrigerant if it holds any, and hauled off. Old refrigerant can't just be vented, it has to be recovered into a tank and taken for reclaim or disposal. That recovery step happens before the old unit is unbolted from the line set or ductwork.

The ductwork and electrical get a second look

Swapping in a heat pump often means the existing ducts and breaker need checking, not just replacing like for like. A heat pump may call for different airflow than the old furnace or AC did, and the air handler can draw more power than a gas furnace's blower did, so the electrical panel gets checked for capacity before the new system goes in.

The unit itself is only part of what you're paying for. Sizing the system right takes a load calculation, not a guess based on the old equipment's rating, and that work shapes which model even fits the job. Line set length and whether it has to run through a wall or up several stories adds labor the equipment cost doesn't show. A dual fuel setup means wiring the heat pump and furnace to hand off to each other correctly, which takes more time than installing either one alone. If the ductwork needs modification to handle the heat pump's airflow, that's cut into the price before the new system ever gets switched on. None of this shows up on a spec sheet, but it's most of what separates one quote from another.

Install day starts with the old system coming out, and most of the morning goes to that before the new unit ever gets set. Once the outdoor unit and air handler are in place, the line set gets connected, the system gets evacuated to pull moisture and air out of the lines, then the refrigerant charge gets set to spec. That charge has to be right. Too little and the system can't move enough heat, too much and it strains the compressor, so a good tech checks it against the manufacturer's numbers rather than eyeballing it. After that comes startup testing, running the system in both heating and cooling to make sure it switches over properly and the thermostat is talking to it the way it should. A dual fuel setup takes longer here, since the heat pump and furnace both need to be wired to hand off to each other at the right point. By the end of the day, the tech should walk you through the thermostat settings and show you where the filter sits, since you'll be the one changing it.