No single fuel dominates here
Gas heats 35% of homes in Nevada County, propane heats 32.1%, and electricity heats 16.5%. No one setup is the default, which means a heat pump going into a propane or electric house is not an unusual swap here.
Takes about a minute. No obligation.
Gas heats 35% of homes in Nevada County, propane heats 32.1%, and electricity heats 16.5%. No one setup is the default, which means a heat pump going into a propane or electric house is not an unusual swap here.
If propane is what's running the furnace now, a contractor will want to know whether the lines and tank setup stay as backup or get retired. Either way, the heat pump has to be sized and installed to carry the home through winter on its own, since the fuel it replaces won't be assumed as a backstop.

NOAA nClimDiv, 1991–2020 normals
The rating on the label is a ratio, how much heat it moves for the power it uses, measured under set lab conditions.
Your actual house isn't a lab, so the ductwork, the sizing and how cold it gets outside all decide what that rating turns into on the coldest night.



Nevada County sits in climate zone 5B, a cool zone where heating carries more of the load than cooling. Any heat pump installed here now has to clear 7.5 HSPF2 for heating and 14.3 SEER2 for cooling, the federal minimum for equipment built from 2023 on. That floor applies whether the home is swapping out propane, gas or electric heat, so it narrows the field before a contractor ever talks sizing or ductwork. A heat pump that clears the federal minimum may also qualify for the federal tax credit available on qualifying equipment. Ask a contractor which models on their list meet it.
Heat runs here from October through May, eight months out of the year. September is the last quiet month before that starts. Installing a heat pump now, before the weather turns, gives it a full system check and a break-in period with nothing riding on it yet. Wait until the first cold snap and the job competes with every other heating call in the county.
Find a contractor
A furnace spends most of its life off. A heat pump doesn't get that rest, since it's handling both sides of the job across the year. That changes what wears first. Contactors and relays that cycle more often wear faster, so ask what's rated for the duty here rather than a unit built assuming long idle stretches. The reversing valve is worth asking about too, since it's the part that switches the system between heating and cooling and a furnace never needed one at all. It only moves when the system changes modes, but a stuck reversing valve means the system is heating when it should cool or the other way around. Filters matter more as well. A clogged filter restricts airflow across the coil year round instead of for just one season, and that strain adds up faster on equipment that rarely shuts down for good.
A contractor works out heating and cooling load by going room by room. How much glass, which way the walls face, how much ceiling and floor area there is to lose heat through or gain it from. Square footage alone doesn't tell you this. Homes built differently need different sized equipment even at the same footprint.
An oversized heat pump satisfies the thermostat fast and shuts off before it finishes a full cycle. Short cycling like that means the system never runs long enough to pull moisture out of the air or settle into steady, efficient operation. Undersized is a different problem. That unit runs constantly and still can't keep up on the coldest days. The right size avoids both.
Most of the time the old furnace or AC doesn't just vanish, someone has to deal with the line set, the ductwork tie-ins and whatever fuel source it used. If propane or gas was running the place, a contractor pulls the old furnace and caps or removes the gas line feeding it, and that's its own piece of work separate from setting the heat pump. The outdoor condenser or compressor gets disconnected and hauled off, along with the old refrigerant lines if they're not being reused. Old ductwork usually stays, but it gets checked for leaks and sized against the new system rather than assumed to be a match. If there was a backup furnace staying in place as supplemental heat, the wiring between it and the new heat pump has to be set up so they coordinate instead of fighting each other. None of this is optional cleanup, it's part of the install itself.
Install day starts with the equipment that's already there. A contractor sets the outdoor unit on a pad or bracket, runs new line set or reuses the old if it's still sound, and ties the indoor coil into the existing ductwork or air handler. Refrigerant lines get connected, then pressure tested before anything is charged. A leak found after the system is running is much harder to track down than one found before. Once the lines hold pressure, the system gets evacuated to pull out moisture and air, then charged with refrigerant to the weight the manufacturer specifies. Electrical is its own piece of work. The heat pump needs a dedicated circuit and disconnect, sized to what the compressor draws. Last comes startup, where the contractor checks airflow, confirms the thermostat is talking to the system correctly, and watches it run through at least one full cycle before calling it done.
