Heat Pump Installation in San Francisco, CA

Tell us about the job

Takes about a minute. No obligation.

New system or replacementHeat PumpSan Francisco County, CA
Step 1 of 2

What ZIP code is the job in?

Gas is the default here

Utility gas heats 55% of homes in San Francisco County, more than any other fuel. Electricity covers another 35.7%, and the rest run on bottled gas or oil.

A heat pump still has to fit the house

If your furnace runs on gas now, a heat pump installer will need to account for the existing gas line and ducting, and look at your electrical panel to see what it can support.

7 months
November through May, your system heats
45°F
the average winter night it heats against
70°F
the average summer afternoon it cools against
Isometric line illustration of a cutaway single-story house showing interior rooms, ceiling ductwork connected to an indoor air handler, and refrigerant lines running to an outdoor condenser unit on a pad.

San Francisco runs electricity at 31.97 cents a kilowatt-hour, well above the national average.

A right-sized heat pump keeps that cost in check. Oversizing it just means paying more to run it.

October is the month to get it in, before heat season starts in November

Heat runs November through May
50 damaging wind events from 2015 to 2024
10 hail events from 2015 to 2024

Half the homes in San Francisco County were built in 1946 or earlier. A heat pump going into a house that age has to work with what's already there, the duct runs, the gas line if you're replacing a furnace, the panel. None of that was sized with a heat pump in mind. A contractor sizing the unit for your house, not a standard house, is what makes it heat and cool the way it should. Get that wrong and you've got a unit that short cycles or can't keep up on a cold morning.

A mild climate means your heat pump won't be working hard

Winter lows here average 45°F, nothing like the cold a heat pump has to fight in most of the country. San Francisco also sees little severe weather, with only 10 hail events in the past decade. A heat pump here just doesn't face the strain it would elsewhere, so you don't need to pay for the highest efficiency model to get a system that holds up.

Find a contractor
A residential heat pump outdoor unit mounted on a concrete pad next to a house with gray vinyl siding.

A system that runs easy, year after year

Over a year, this adds up to a system that just doesn't get pushed. Put the money into a unit that's sized right and installed well, not into the highest tier of efficiency on the shelf.

What the rating actually measures

The efficiency rating on a heat pump tells you how much heat it moves for the power it uses, averaged across a season of weather rather than any one day. It's not a number that shows up on the electric bill. Units with the same rating on the label can still cost different amounts to run, depending on how they're sized and installed.

Installation decides more than the label does

A high-rated heat pump installed with ductwork that's too small or a refrigerant charge that's off will never hit the number on its label. That rating is a ceiling, not a guarantee. Where the unit actually lands depends on sizing, the ducts it's tied into, and the install itself, not the sticker on the side of it.

If you're replacing a furnace, that furnace doesn't just get switched off. It has to come out, and so does anything tied to it that won't carry over, like a flue that vented it through the roof. If the old system ran on gas and you're going all-electric, the gas line feeding it gets capped off by whoever handles that trade. The ductwork is a separate question. A lot of the time it stays, and the heat pump ties into what's already run through the house, so the contractor needs to check it can handle the airflow a heat pump moves. An old condenser or air handler gets hauled off once the new equipment is in and running. None of this happens on its own. It's part of the install, not an afterthought to it.

Install day starts with the old equipment coming out, not the new one going in. Whoever's doing the work checks the refrigerant lines to see if they can be reused, since a heat pump runs different pressures than what might have been there before. Once the new unit is set, on a pad outside and an air handler or coil inside, the electrical hookup gets run to it. That work gets inspected before anyone calls the job done. After that comes charging the refrigerant to the level the manufacturer specs, and testing airflow at the vents to make sure the ductwork is moving what the unit needs. A heat pump that's low on charge or starved for airflow will still run, just not well, and that won't show up until the first really hot or cold day. Before anyone leaves, it should be cycling in both heating and cooling, not just one.